You don't have javascript enabled. Good luck with that.
Pencarian
Kembali, Pembangunan Waduk Rambutan Terkendala BBM

Heavy Equipments for Rambutan 1 Reservoir Operation Stopped

The construction of Rambutan 1 reservoir in Kampung Rambutan, Ciracas, East Jakarta is neglected once again. It is because of no diesel fuel supply for the heavy equipments.

I have no idea about that

Yayat (37), one of local residents, the four heavy equipments have not operated since Friday (10/14).

“I have no idea about that,” he said, Monday (10/17).

Rambutan 1 Reservoir Project Needs Additional Equipment

After being confirmed, project supervisor, Marudin, admitted there is no diesel fuel supply for the heavy equipments. It is allegedly that the late supply is caused by administration process.

Meanwhile, Jakarta Head Dept. of Water Management, Teguh Hendarwan, refused if the project is neglected.

“I’ll check it later. The project remains run,” he stated.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye790 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye697 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye636 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye548 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye444 personDessy Suciati